Construction and Commissioning

Gas of Tehran province

(2020 – 2025)

Installation of 113 electric emergency shut-off valves

Fajr Energy Persian Gulf Company

(2021 – 2023)

Construction and installation of support structures and high-pressure piping

Hengam Petrochemical 

(2020 – 2022)

Installation of precision instruments to enhance olefin production capacity

Takht Jamshid Petrochemical 

(2019 – 2020) 

Construction of a raw water pipeline

Aria Sasol  Petrochemical 

(2019 – 2020)

Cabling in the offsite area

Aria Sasol  Petrochemical 

(2018 – 2019)

Installation of two drum cookers and associated piping

Hasheminejad Gas Refining Company

(2018 – 2019)

Surface preparation, painting, insulation, and scaffolding operations

National Oil Company (South Region)

(2017 – 2019)

Development of exploitation units

Bandar Imam petrochemical 

(2017 – 2018)

Replacement of cold insulation on a spherical tank

Iran Central Regions Oil Company (Central region)

(2013 – 2014)

Installation of well facilities and flow pipelines

petrochemical Oil Company (Shorijeh Formation)

(2013 – 2014)

Installation of well facilities

Petrochemical Oil Company (Staydar Gharb)

(2012 – 2018)

pipeline project

Petrochemical Oil Company (Aban Location)

(2012 – 2013)

Installation of well facilities and flow pipelines

Maroon Oil and Gas Exploitation Company

(2011 – 2013)

 Replacement of the desalination pop metal pipe